RACI Generator
Build a RACI matrix: who is responsible, accountable, consulted, and informed. Copy or download the grid.
Names and tasks stay on this page. Copy or download the grid if you want to keep it.
- R Responsible — Does the work
- A Accountable — Owns the outcome — usually one person
- C Consulted — Asked before it happens
- I Informed — Told after it happens
Choose a role in each cell. Aim for one accountable person on each task. Swipe sideways to see every person.
| Task | Alex | Sam | Jordan |
|---|---|---|---|
| Brief | |||
| Design | |||
| Build | |||
| Review |
Worked example
A task “Publish the page” with Alex as R, Sam as A, and Priya as C reads Responsible, Accountable, Consulted. Choose the role in the cell. The page warns if a task has no accountable person, or more than one. Copy exports the grid as tab-separated text for a spreadsheet.
FAQ
- What do R, A, C, and I mean?
- Responsible does the work. Accountable owns the outcome — usually one person. Consulted is asked. Informed is told.
- How many A’s should a task have?
- One. More than one accountable and nobody is. The page will say so under the task.
- Can I paste the grid into a spreadsheet?
- Yes. Copy table is tab-separated. Download .csv if you would rather have a file.